Portfolio

Double storey house extension and porch

Project completed in 11 weeks.

This project provided the client with a single garage with electric roller door, leading through to a utility room at the front, where the new boiler is now situated.

A doorway was formed at the bottom of the stairs to access the utility room. The new porch provided extra space and security at the front door. Another doorway was formed at the top of the stairs which led into a new bedroom with ensuite.

Back to Portfolio